Zentallio

A wedding date
does not move.
Everything else must.

Every open order scored against real atelier capacity — so a slip surfaces while it is still recoverable, not at the fitting.

An executive briefing

The fitting floor
Illustrative · not a client site

← → to advance

THE ATELIER · WEEK 34, RIGHT NOW

Four bridal orders,
the same two karigars.

Not four problems. One stage, over-committed by thirty-eight hours — and four dates that cannot move.

Open orders

0

On-time handover

0%

Atelier load

0%

Iris

Watching

THREE THINGS THE ATELIER CANNOT HOLD IN ITS HEAD

The measurement.
The promise. The week.

Every measurement

the second order fits better than the first

Each alteration writes back to the customer's file, so.

Iris remembers a fit you took two years ago.

The promise date

while it is still recoverable

Every open order scored against real atelier capacity — so a slip surfaces, not at the fitting.

Iris knows which promise is about to break.

The karigar's week

capacity is a number rather than a hope

Work loaded by skill and stage — embellishment, cutting, finishing — so.

Iris loads the atelier by skill, not by hope.

THE BOARD · FOUR LENSES, LIVE · MAISON ZARA · 46 ATELIERS · PAKISTAN & GULF

Every order
on one board.

Financial

on plan

3.9M

Open order-book value

DEPOSIT EXPOSURE 1.1M

Customer

▲ 5 pts

64%

Returning bridal clients

REFERRAL RATE 31%

Operational

watch

96.1%

On-time handover

ATELIER LOAD 84%

AI-Learning

▲ improving

91.4%

Promise-date accuracy

MODELS LIVE 7

LIVE · ILLUSTRATIVE DATA — Maison Zara is a demonstration brand, not a deployed client.

THE SAME BOARD, THREE LAYERS DEEP

Rules fire. Models predict.
Iris explains.

L1 · Zen Rules — deterministic thresholds Rule
RuleThresholdNowState
Open order-book value≥ 3.9M3.9Mclear
Returning bridal clients≥ 60%64%clear
On-time handover≥ 92%96.1%watch
Promise-date accuracy≥ 87%91.4%clear

L2 · Zen Models — what is predicted

ModelPredictsAccuracy
Promise-date riskslip probability by order92.1%
Atelier loadstage capacity89.6%
Drop sizingper-city run size90.7%
L3 · Ask Iris — the same board, in words What just

What just moved?

Capacity rule breached — embellishment stage over-committed by 38 hours.

Why, and what do I do?

Move embellishment on two orders now — every promise date holds.

The rule states the breach. The model puts a probability on each order behind it. Iris names the two moves that clear the stage — and says plainly that every date then holds, which is the only sentence a bride's mother is interested in.

SEVEN LIVE PRODUCTS · RUNNING RIGHT NOW

Pick one. It opens
the real screen.

Order-book value, atelier load, promise-date risk and deposit exposure in one view.

Balanced Scorecard

FOUR LENSES, LIVE

Point of Sale

LIVE TILL, IRIS UPSELL

Numerus · CFO

BALANCED, NOT ESTIMATED

Nexus · Supply Chain

FORECAST, PROCUREMENT, LOGISTICS

Motus · Operations

STANDARDS, ASSETS, ENERGY

Manus · Workforce

ROSTER, PAYROLL, COMPLIANCE

Zentallio Vision

FOOTFALL, QUEUES, SAFETY

LIVE TILL, IRIS UPSELL

Point of Sale

A couture order is not a transaction — it is a deposit, a measurement, a promise date and six months of instalments. The till has to hold all four.

The order opens with the file attached.

A returning client's measurement history is on the screen before the consultation starts.

Deposit and instalment on one ledger.

What is paid, what is due and what is at risk if the order is cancelled are one number, not three.

Iris checks the date before it is promised.

A date is quoted against real stage capacity, so it is a commitment rather than an optimism.

214

Open orders, live

12

Core POS solutions, standard

LIVE TILL · IRIS UPSELL

FOUR LENSES, LIVE

Balanced Scorecard

Order-book value, returning clients, on-time handover and promise-date accuracy on one live board — with Iris naming the stage that is about to break a date.

The order book is the balance sheet.

In couture, value sits in commitments not yet delivered — and in deposits already taken against them.

On-time handover is watched, not celebrated.

96.1% is comfortably above threshold, and still on watch, because atelier load at 84% says the next weeks are tighter than the last.

The fourth lens audits the AI.

Promise-date accuracy is reported next to margin, because a date is only worth what the model behind it is worth.

3.9M

Open order-book value

91.4%

Promise-date accuracy

FINANCE · L2

BALANCED, NOT ESTIMATED

Numerus · CFO

Trial balance, P&L, balance sheet and cash flow on a ledger that ties out to the penny — with deposits held as the liability they are until the garment is handed over.

Deposits are a liability, not revenue.

1.1M taken against orders not yet delivered is exposure, and the ledger treats it that way.

Work in progress is valued by stage.

A lehenga three stages into zardozi is worth more than one still in cutting, and the balance sheet knows the difference.

Ask Iris for any number.

Any atelier, any order, any period — answered in the conversation rather than a week after close.

1.1M

Deposit exposure, live

By stage

Work in progress, valued

CFO · BALANCED LEDGER

FORECAST, PROCUREMENT, LOGISTICS

Nexus · Supply Chain

Fabric, thread, zari and trims planned against the order book — where a single missing component can hold a finished garment for a week.

Procurement follows the order, not the season.

A bespoke order pulls its own bill of materials, so nothing is bought on a guess.

Lead time is part of the promise date.

A date cannot be quoted for a fabric that takes five weeks to arrive, and the system will not let it be.

Unstitched and lawn run separately.

A volume drop and a bespoke order share a warehouse but nothing else, and they are planned apart.

Per order

Bill of materials pulled

In the date

Lead time, not beside it

SUPPLY CHAIN

STANDARDS, ASSETS, ENERGY

Motus · Operations

Stage sign-off, quality gates and studio standards across 46 ateliers — because in couture the standard is the product.

Every stage is signed off.

Cutting, zardozi, aari, finishing — a garment cannot advance without the stage before it closing.

Quality gates are evidenced.

A rework caught at finishing costs a week; caught at the stage, it costs an afternoon.

Exceptions escalate themselves.

The stage that did not close surfaces to a human; the rest stays quiet.

46

Ateliers, one standard

Per stage

Sign-off, not per garment

OPERATIONS

ROSTER, PAYROLL, COMPLIANCE

Manus · Workforce

The karigar's week, planned by skill rather than by headcount — because an atelier's capacity is not people, it is particular pairs of hands.

Skill is the unit, not the head.

Two zardozi karigars are not interchangeable with two finishers, and the roster refuses to pretend otherwise.

Contract karigars are capacity you can buy.

When a stage over-commits, the roster knows who can be booked and at what cost.

Piece-rate and payroll on one record.

What was made, by whom, at which stage, and what it earns — without a parallel notebook.

By skill

Loaded, not by headcount

84%

Atelier load, live

WORKFORCE

EVERY SOLUTION · ETHNIC, BRIDAL & COUTURE

Every solution,
on the real screen.

Grouped by what they act on. Pick one and it runs.

In the atelier · 3 solutions — every open order,
In the atelier · 3 solutions — every open order, stage by stage

Thresholds that fire on the shift the breach happens — no model lag, no waiting for a report.

Measurement & fit profile

L1 · DISTRIBUTION

Appointment & consultation studio

L1 · LIVE QUEUE

Deposit, instalment & cancellation

L1 · CONTRIBUTION

The order book · 4 solutions — what the book says
The order book · 4 solutions — what the book says before the fitting

Modelled early enough to act on, with the cause named and the move costed.

Promise-date risk scoring

L2 · DETECTION

Atelier & karigar capacity planning

L2 · CAPACITY

Unstitched & lawn drop planning

L2 · ROUTING

Ask Iris · order book

L3 · LIVE QUEUE

Plus 12 core POS solutions, standard across every Zentallio retail sector — detailed later in this briefing.

L1

Iris · Intelligence layer 01

How Iris enforces the rules.

Thresholds that fire on the shift the breach happens (the “Zen Rules” layer) — the measurement file, the appointment book and the money taken against a promise. Three solutions run on this layer.

WEEK 34

RULE FIRED

Capacity rule breached

Embellishment stage over-committed by 38 hours. Four bridal orders route through the same two karigars — and not one of the four dates can be moved.

IRIS · L1 ZARDOZI

Iris · L1 · Zen Rules 01 / 03

Measurement & fit profile

Distribution / Measurement & fit profile  ·  Maison Zara

LIVE · ILLUSTRATIVE DATA

1,840

profiles on file

group

2.1

alterations per order

−0.4 vs LY

64%

fit first time

+9 pts

3

files stale

> 24 months

Client files · this week's book — versioned Client
ClientVersionLast alteredAdjustmentsState
A. Sheikhv42023shoulder, fallcurrent
M. Qureshiv22024sleevecurrent
S. Ahmedv12021—re-measure
H. Malikv32025waist, hemcurrent
Other 1,836 files———current
2.7 per order

Alterations per order — four seasons

2022

2023 2.5 per order

2024 2.3 per order

This season 2.1 per order

Each alteration round costs ~6 atelier hours

Iris · what to do

A. Sheikh's file is at v4 — the shoulder and fall were adjusted in 2023 and never reverted. Applying it to BR-2291 removes an expected fitting round, which is six atelier hours in the week zardozi is already over-committed.

Apply v4 to BR-2291 Book one fitting only Flag 3 stale files

Iris · L1 · Zen Rules 02 / 03

Appointment & consultation studio

A bridal consultation is not a table for two — it is a room, a stylist, a rail of samples and ninety uninterrupted minutes. The book has to reserve all four or it has reserved nothing.

01

An appointment reserves room, stylist and sample rail together, so a double-booked fitting room cannot happen.

02

Fitting slots are held against the production stage that needs them, which is why a fitting slot appears as a slip cause on the risk board.

03

The client's file, past orders and stated occasion are surfaced before the consultation begins, not looked up during it.

04

Party size is captured, because a bride arriving with six is a different room and a different hour from a bride arriving alone.

05

No-shows and rescheduling are tracked against the promise date, since a missed fitting moves a delivery date whether anyone says so or not.

L1 · LIVE QUEUE

4 things

Reserved as one

Linked

Fitting slot to promise date

Group — In the atelier · “Every open order, stage by stage.”

Iris · L1 · Zen Rules 03 / 03

Deposit, instalment & cancellation control

1.1M is held against garments not yet delivered. Every rupee of it is somebody's deposit on a date — and the rules governing it should not be a conversation at the counter.

01

Deposit schedules are configured per order type, and the balance due at each stage is a rule rather than a negotiation.

02

Instalments are tracked against production stage, so money and progress stay in step across a six-month order.

03

Cancellation terms apply by rule against how far the garment has advanced — cut cloth cannot be refunded like an untouched order.

04

Deposit exposure is reported live as the liability it is, not as revenue already earned.

05

Overdue instalments surface before the next stage starts, which is the only moment holding work is still a fair option.

L1 · CONTRIBUTION

1.1M

Deposit exposure, live

By stage

Cancellation terms applied

Group — In the atelier · “Every open order, stage by stage.”

L2

Iris · Intelligence layer 02

How Iris predicts the slip.

What the book says before the fitting (the “Zen Models” layer) — modelled early enough to act on, with the cause named and the move costed. Three solutions run on this layer.

Stage hours by week — Committed vs Available

Available Committed

Iris · L2 · Zen Models 01 / 03

Promise-date risk scoring

Signals / Promise-date risk scoring  ·  Maison Zara

LIVE · ILLUSTRATIVE DATA

4

orders at risk

week 34

0.72

highest slip probability

BR-2291

214

open orders

group

96.1%

on-time handover

YTD

Orders scored · week 34 — slip probability Order
OrderClientDueRiskCause
BR-2291 LehengaA. Sheikh14 Aug0.72zardozi
BR-2288 ShararaM. Qureshi16 Aug0.58zardozi
BR-2276 Walima gownS. Ahmed17 Aug0.41finishing
BR-2302 Nikah setH. Malik18 Aug0.34fitting slot
Other 210 orders——< 0.15clear
62 / 80 hrs

Stage load · week 34 — committed vs available

Cutting

Zardozi 118 / 80 hrs

Aari work 71 / 90 hrs

Finishing 58 / 60 hrs

Fitting 26 / 40 hrs

Zardozi over-committed by 38 hours

Iris · what to do

All four at-risk orders route through one stage and one pair of hands — zardozi, over-committed by 38 hours. This is not four problems, it is one. Moving the embellishment on BR-2291 and BR-2288 to the contract karigar clears the stage and every promise date holds.

Re-sequence the two Book contract karigar Call the four clients

Iris · L2 · Zen Models 02 / 03

Atelier & karigar capacity planning

Capacity as a number rather than a hope. Work loaded by skill and stage — embellishment, cutting, finishing — so an over-commitment is visible weeks before it becomes a phone call.

01

Load is modelled per stage and per skill, at 89.6% accuracy, because an atelier's real constraint is rarely the whole workshop.

02

Every order consumes hours from the specific stages it passes through, so committing an order is committing a calendar.

03

A new order cannot be dated against a stage that is already full — the promise is checked before it is made, not after.

04

Contract karigar capacity is modelled as buyable overflow, with the cost of buying it shown against the cost of the slip.

05

Seasonal peaks — wedding season, Eid, festival drops — are forecast against the same stage model rather than absorbed by overtime.

L2 · CAPACITY

89.6%

Stage capacity model accuracy

84%

Atelier load, live

The capacity model behind the risk score — see Promise-date risk scoring.

Iris · L2 · Zen Models 03 / 03

Unstitched & lawn drop planning

The other half of the business. A lawn drop is a volume event with one shot at it — sized per city, released in hours, and either right or discounted for the rest of the season.

01

Run size is modelled per city at 90.7% accuracy, because Lahore, Karachi and Dubai do not want the same volume of the same design.

02

Design-level demand is predicted before print, which is the only point at which the quantity can still be changed.

03

The drop is released across counter, web and stockists on one live stock pool rather than three allocations that drift.

04

Sell-through in the first hours is read against the projection, so a restock decision is made while the print run is still viable.

05

Volume and bespoke never compete for the same atelier hours — they are planned as two businesses that share a building.

L2 · ROUTING

90.7%

Drop-sizing accuracy, per city

Before print

Demand predicted

Group — The order book · “What the book says before the fitting.”

L3

Iris · Intelligence layer 03 — live

Ask Iris · order book

Not a screenshot — the actual agent, reading the same order book the rules and models write to.

ASK IRIS — ETHNIC, BRIDAL & COUTURE

Live Balanced Scorecard

0%

On-time handover

0

Open orders

0%

Atelier load

0%

Promise-date accuracy ▲

STANDARD ACROSS ALL NINE RETAIL SECTORS

Twelve core POS solutions,
in every sector.

The sector solutions sit on top of these. They are not an upsell and they are not configured per customer — every Zentallio retail deployment ships with all twelve.

Checkout

Returns & exchange

Store credit

Tender & reconciliation

Tax

Discount governance

Customer capture

Loyalty

Offline resilience

Cash management

Shift close

Audit trail

HOW IT'S IMPLEMENTED

Implementation,
run by Iris.

You configure a sector playbook, not a custom project. Iris applies it herself — agentically, from day one.

Onboarding is agentic.

Iris connects the order book, the client files and the atelier's stage definitions directly — no manual data mapping.

Existing measurement books are imported, not retyped.

Historic client files carry their versions in, which is what makes the fit model useful in month one.

Live in weeks, learning from day one.

Go-live is a configuration, not a project plan.

HOW SUPPORT WORKS

Support starts
with Iris.

The first line of support is agentic — Iris resolves most of it herself. Our engineers pick up from there.

Layer 1 — Iris, 24/7.

Configuration questions, anomalies and routine issues resolved directly, instantly.

Layer 2 — our engineers.

Anything Iris can't close escalates automatically to a Zentallio engineer.

No blank tickets.

Every escalation arrives with Iris's own diagnosis — engineers start from an answer.

WHAT AN OPERATOR CAN EXPECT

The date, held.

A slip surfaces
weeks early

Not at the final fitting

One cause,
not four problems

The stage named, not the orders

The move,
costed in hours

Contract karigar against the slip

The second order
fits better

Every alteration written back

Modelled outcome figures for this sector were not included in the source page. When supplied they replace these four cards and carry the standard disclaimer: modelled from pilot assumptions & comparable benchmarks — not yet a deployed-client result. All screen data in this briefing is labelled live & illustrative.

WHERE IT LEAKS, HOW IRIS RESPONDS

Where a promise
quietly stops being one.

Where it breaks 01 A date quoted against a workshop
01

A date quoted against a workshop rather than against the one stage that actually constrains it.

02

Four orders read as four problems, when they are one karigar booked four times.

03

A measurement taken three times because the alteration was never written back to the file.

How Iris responds L1 The fit file is versioned, the
L1

The fit file is versioned, the appointment reserves everything it needs, and deposit terms apply by stage.

L2

Slip probability per order at 92.1%, stage capacity at 89.6% — so the cause is named, not guessed.

L3

“Why, and what do I do?” — two moves, and every promise date holds.

38 hours

of zardozi over-commitment, cleared by moving two orders — four dates held, none of which could have moved.

ONE PLATFORM, TWO LINES

The same spine,
a different floor.

Ethnic, Bridal & Couture is sector two of nine in Fashion Retail. The layers, the seven products and Iris herself are the same ones running across ten Food & Beverage sectors.

Fashion Retail — 9 sectors

01 Apparel & RTW 02 Ethnic & Bridal 03 Kids & Teen 04 Sportswear 05 Footwear 06 Cosmetics 07 Fabric & Textile 08 Home Textiles 09 Marketplace

Food & Beverage — 10 sectors, 149 solutions

01 Quick Service 02 Casual Dining 03 Fine Dining 04 Café & Bakery 05 Ice Cream & Desserts 06 Beverages & Drinks 07 Health & Wellness 08 Cloud Kitchen 09 Institutional & B2B 10 Niche & Experience

Let's put Iris
in your atelier.

Book a call with our consultant — a pilot walkthrough on your own order book, your own season.

INFO@ZENTALLIO.COM

+92 327 000 0901  ·  +1 929 419 2694  ·  zentallio.com  ·  142-C, D.H.A. Commercial Broadway, DHA Phase 8, Lahore 54940

← → NAVIGATE  ·  F FULLSCREEN

⭳ DOWNLOAD PDF

01 / 14

Book a walkthrough